North Sea Wind, our 380 MW offshore wind farm in the IJmuiden Ver zone, entered commercial operation on 5 September 2025. The project installed 35 turbines of 11 MW each on monopile foundations, with first power exported to the TenneT grid on the same day. Generation is contracted under a 15-year corporate PPA with North Sea Hydrogen, a green-hydrogen offtaker, which has built a 200 MW electrolyzer at the Port of IJmuiden. Construction took 28 months from final investment decision to commercial operation.