Portfolio · 3 countries

Sunlight, structured for the long horizon

We develop, own, and operate utility-scale solar and battery storage across three continents, with capacity factor and avoided emissions reported plant-by-plant every month.

Atlas Plains Solar — 220 MW solar, operating Coastal Rise Wind — 180 MW wind, operating Murray Bend Storage — 150 MW storage, operating Sierra Alta Solar — 300 MW solar, operating Pampas Wind — 240 MW wind, construction Atacama Storage — 200 MW storage, construction North Sea Wind — 380 MW wind, operating Friesland Solar — 120 MW solar, operating Ijssel Storage — 100 MW storage, development
  • Solar
  • Wind
  • Storage
  • Construction
Monthly generation — last 12 months
Jan 24Apr 24Jul 24Oct 24Dec 24
Nameplate capacity
1.89 GW
Generation / year
3.47 TWh
CO₂e avoided / year
2.29 Mt
Countries operating
3
At a glance

A portfolio built for the next 25 years

All projects
1.89 GW
Total nameplate capacity
1.35 GW
Operating today
3.47 TWh
Annual generation (operating)
2.29 Mt
CO₂e avoided per year
6 of 9
Operating plants
Corporate PPA

Structure a 10-year PPA against your actual load

Model coverage and savings for a corporate offtake contract. Plug in your annual consumption, pick a load profile, and set the tenor — the calculator returns the covered share and an indicative price.

  • Virtual or physical structure
  • Match to industrial, flat, or 24/7 load profiles
  • Tenors from 5 to 15 years
Open the calculator
Worked example
Annual consumption
50,000 MWh
Tenor
10 years
PPA price
$52 / MWh
Grid price
$78 / MWh
Covered share
72%
10-year savings
$9.4M

Demo figures — replace with your own. See the calculator.

Performance & data

Monthly generation, published plant-by-plant

Every operating plant is reported with capacity factor, availability, and avoided emissions. The dashboard is updated monthly and audited against the SCADA feed.

Open dashboard
Last 12 months · operating portfolio
GWh 0 87 175 262 350 Jan 2024: 159,700 MWh Jan Feb 2024: 151,300 MWh Feb Mar 2024: 165,900 MWh Mar Apr 2024: 163,100 MWh Apr May 2024: 161,600 MWh May Jun 2024: 159,600 MWh Jun Jul 2024: 180,900 MWh Jul Aug 2024: 182,800 MWh Aug Sep 2024: 181,700 MWh Sep Oct 2024: 322,700 MWh Oct Nov 2024: 329,200 MWh Nov Dec 2024: 349,500 MWh Dec
View as table
MonthGeneration (MWh)Avoided CO₂e (t)
Jan 2024159,700102,537
Feb 2024151,30096,249
Mar 2024165,900105,102
Apr 2024163,100103,848
May 2024161,600102,870
Jun 2024159,600101,664
Jul 2024180,900114,528
Aug 2024182,800115,692
Sep 2024181,700114,801
Oct 2024322,700178,218
Nov 2024329,200180,168
Dec 2024349,500190,995
Build with us

We are hiring across operations, commercial, and engineering

Open roles in Antofagasta, Amsterdam, and San Francisco. We hire for the long horizon: most of the team has been here for more than five years.