Atlas Plains Solar

A 220 MW single-axis tracking solar farm powering a 12-year corporate PPA with Hartog Steel, an industrial offtaker.

Atlas Plains Solar came online in two phases during 2022. The plant uses bifacial modules on single-axis trackers, delivering a 25.1% capacity factor across the first three operating years. Output is contracted under a 12-year virtual PPA with Hartog Steel, an industrial offtaker; surplus generation is sold into the National Electricity Market.

Nameplate capacity
220 MW
Commissioned
2022
Capacity factor
25.1%
Annual generation
484 GWh
CO₂e avoided
392 kt / year
Offtaker
Corporate PPA — Hartog Steel
bifacialsingle-axis tracker12-year vPPA

Monthly generation

12 months · 488 GWh total
GWh 0 12 24 36 48 2024-01: 38,200 MWh 01 2024-02: 34,800 MWh 02 2024-03: 40,100 MWh 03 2024-04: 37,900 MWh 04 2024-05: 35,400 MWh 05 2024-06: 32,800 MWh 06 2024-07: 41,500 MWh 07 2024-08: 43,200 MWh 08 2024-09: 44,800 MWh 09 2024-10: 46,600 MWh 10 2024-11: 45,100 MWh 11 2024-12: 47,800 MWh 12
View as table
MonthGeneration (MWh)
2024-0138,200
2024-0234,800
2024-0340,100
2024-0437,900
2024-0535,400
2024-0632,800
2024-0741,500
2024-0843,200
2024-0944,800
2024-1046,600
2024-1145,100
2024-1247,800

Project lifecycle

  1. Development

    Site selection, permitting, offtake structuring

    complete
  2. Construction

    EPC, equipment, energization

    complete
  3. Operations

    O&M, performance monitoring, offtake delivery

    current