Solar PV Chile operating

Sierra Alta Solar

A 300 MW solar plant in the Atacama Desert, one of the highest-irradiance sites in the world.

Sierra Alta Solar sits at 1,500 m elevation in the Atacama, where direct normal irradiance exceeds 3,000 kWh/m²/year. The plant uses fixed-tilt monocrystalline modules and has averaged a 27.4% capacity factor since 2020. Output is contracted under two corporate PPAs with mining offtakers including Cobre Norte Mining, structured as 24/7 block contracts.

Nameplate capacity
300 MW
Commissioned
2020
Capacity factor
27.4%
Annual generation
720 GWh
CO₂e avoided
540 kt / year
Offtaker
Corporate PPA — Cobre Norte Mining
fixed tilt24/7 block PPAhigh-irradiance site

Monthly generation

12 months · 785 GWh total
GWh 0 19 37 56 75 2024-01: 61,200 MWh 01 2024-02: 58,400 MWh 02 2024-03: 63,900 MWh 03 2024-04: 60,100 MWh 04 2024-05: 58,200 MWh 05 2024-06: 56,400 MWh 06 2024-07: 67,100 MWh 07 2024-08: 68,800 MWh 08 2024-09: 71,200 MWh 09 2024-10: 73,500 MWh 10 2024-11: 71,200 MWh 11 2024-12: 74,800 MWh 12
View as table
MonthGeneration (MWh)
2024-0161,200
2024-0258,400
2024-0363,900
2024-0460,100
2024-0558,200
2024-0656,400
2024-0767,100
2024-0868,800
2024-0971,200
2024-1073,500
2024-1171,200
2024-1274,800

Project lifecycle

  1. Development

    Site selection, permitting, offtake structuring

    complete
  2. Construction

    EPC, equipment, energization

    complete
  3. Operations

    O&M, performance monitoring, offtake delivery

    current