Portfolio · 3 countries

Project portfolio

Every asset we own, build, or develop — solar, wind, and storage across Australia, Chile, and the Netherlands. Filter by technology, country, or status. Totals are computed live from project data.

Capacity (filtered)
1.89 GW
Annual generation (filtered)
4.25 TWh
CO₂e avoided (filtered)
3.19 Mt
Plants (filtered)
9 of 9
Technology
Country
Status
Reset
Solar PV Australia operating

Atlas Plains Solar

A 220 MW single-axis tracking solar farm powering a 12-year corporate PPA with Hartog Steel, an industrial offtaker.

220 MW capacity 2022 commissioned 25.1% CF
Wind Australia operating

Coastal Rise Wind

A 180 MW onshore wind farm on the Victorian coast, contracted under a 10-year corporate PPA.

180 MW capacity 2021 commissioned 39.0% CF
Storage Australia operating

Murray Bend Storage

A 150 MW / 300 MWh lithium-ion battery providing frequency regulation and evening peak shaving.

150 MW capacity 2023 commissioned
Solar PV Chile operating

Sierra Alta Solar

A 300 MW solar plant in the Atacama Desert, one of the highest-irradiance sites in the world.

300 MW capacity 2020 commissioned 27.4% CF
Wind Chile construction

Pampas Wind

A 240 MW onshore wind project under construction, expected online in Q3 2026.

240 MW capacity 2026 commissioned 37.1% CF
Storage Chile construction

Atacama Storage

A 200 MW / 800 MWh battery co-located with Sierra Alta Solar, shifting midday generation to evening peaks.

200 MW capacity 2026 commissioned
Wind Netherlands operating

North Sea Wind

A 380 MW offshore wind farm in the IJmuiden Ver zone, contracted to North Sea Hydrogen, a hydrogen offtaker.

380 MW capacity 2024 commissioned 46.0% CF
Solar PV Netherlands operating

Friesland Solar

A 120 MW agrivoltaic solar farm co-located with sheep grazing, contracted to Holland Consumer Brands, a corporate offtaker.

120 MW capacity 2023 commissioned 11.6% CF
Storage Netherlands development

Ijssel Storage

A 100 MW / 400 MWh battery in development, providing balancing services to the Dutch grid.

100 MW capacity 2027 commissioned
Lifecycle

From site selection to 30 years of operations

  1. 01

    Development

    Site selection, environmental permitting, grid interconnection studies, and offtake structuring. Typically 18–36 months.

  2. 02

    Construction

    Final investment decision, EPC contracting, equipment procurement, and energization. Typically 12–30 months depending on technology.

  3. 03

    Operations

    Performance monitoring against SCADA, O&M, offtake delivery, and monthly reporting to investors and offtakers. 15–35 years.